hydraulic compressed mould wood pallet making machine

FOB Reference Price:Get Latest Price
US $30,000-43,000 / Sets | 1 Set/Sets Compressed wood pallet machine (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Condition:
New
Place of Origin:
Henan, China (Mainland)
Brand Name:
lankai
Model Number:
TP800
After-sales Service Provided:
Overseas service center available
function:
wood pallet machine
SupplyAbility
SupplyAbility:
Set/Sets per Month mould pallet machine
Packaging & Delivery
Packaging Details
container
Port
Ningbo
Lead Time :
45days

Specifications

compressed mould wood pallet making machine
1.High pressure
2.Hydraulic machine
3.High temperature

 

compressed wood pallet machine is used to make compressed wood pallet:

Feature of the wood pallet:

  1. 1.      High temperature, high pressure can press the materials into pallet one time, standard size, without metal materials in the pallets.
  2. 2.      Pallets can be used in export package, free fumigation, and free quarantine; do not need any test before export.
  3. 3.      Reasonable design of the structure, high performance.
  4. 4.      According the European standard, biodegradability.
  5. 5.      Water proofs, insect prevention, and protection against termites, antisepticises and do not easy to burn.
  6. 6.      Strong bearing capacity, no deformation and can be reused.
  7. 7.      Can be forked from four directions, easy to use the pallets.
  8. 8.      Can be store in bulk, save room, easy to be transported.
  9. 9.      Light weight, beautiful shape.

Technial paramter of the press machine :

Model

    LKP-800

Pressure

800Ton  

Hydraulic oil cylinder diameter

290mm

Hydraulic oil cylinder quantity

4

Feeding way

Manual feeding

Heating temperature

130degree

Motor

7.5kw

Pallet density

850kg/cubic meter

Capacity

 144pce per day(16hours)

Time for enough pressure

35 seconds

Time for one piece

450seconds

Installation service terms:

1. The customer should prepare the factory well before the engineer come the install the machines.

2. The customer should pay flight tickets for the engineers

3. The customer should provide hotel and food for the engineers.

4. The customer should pay everyday 60USD salary to the engineers.

5. Total install time will be 12days to 15days. Include training customers’ workers, and testing the machine well and making sure the machine can work well.

6. The customer should prepare one translator for our engineer for communication.

8. The engineer should come to install the machine immediately after the customer send the invitation letter and that should be the machine reach the customers ‘factory.

 Delivery time:

1. 45days after received the 50% advanced payment.

2. Loading port: Ningbo seaport

3. Need two 20ft open top container, and two 40 containers.

Warranty terms:

  1. 1.      Warranty time: 12 month.
  2. 2.      Within three years, if any spare parts broken because of the quality of the machine itself we will provide free spare parts, but as for the wrong operation of the workers, we will not be responsible for the spare parts.
  3. provie spare parts and design

Working procuess of the machine line :

fianal pictur of the prodcuts:

 Material :

More detailed information please contact me: